Connetics was contracted to install and commission the Orion electrical reticulation network throughout the entire Faringdon development in Rolleston, Christchurch.
A major element of the project was the conversion of the 33kV and 11kV overhead power lines to underground.
More recently, Connetics has worked on 'The Link', which links the original stages of Faringdon in the west (which we started in 2012) to the eastern stages of Faringdon (which we started in 2018).
Faringdon has been a great success. We have been working with the developer for over 20 years, with the same civil contractor, so strong personal relationships have been developed and grown with deep trust that we will always strive to deliver exactly what the developer needs, within budget and on time.