When the sun went down and lights came on, I thought WOW. I was really proud of the result.
- Robert St-Denis, Lead Designer
Connetics successfully delivered the lighting design and installation for more than nine kilometres of new road lighting including the selection and procurement of more than 800 luminaires and associated lighting infrastructure.
Important aspects of the design included:
- Interactive “smart’ lighting treatment and controls for three overpass bridges
- Complex Road-abouts, interchanges and access ramps
- Cycleway lighting
The EAE Bantwasher LED Luminaire and Control was supplied by Energylight.